Gare des Eaux-Vives

Year of completion: 2022 (phase 1) – 2025 (phase 2)

Lead Designer: MSV Architectes Urbanistes 

Scope: Water feature design (Schematic & Construction documents)

The landscaping project developed by MSV Architectes reinterprets the strip structure of the site based on a railway logic. The elevated garden in front of the Nouvelle Comédie includes new fountains within a new landscaping design. The linear composition of the basin and the mist reinforce the architectural language deployed for this environment.